Issue |
ESAIM: COCV
Volume 30, 2024
|
|
---|---|---|
Article Number | 6 | |
Number of page(s) | 24 | |
DOI | https://doi.org/10.1051/cocv/2024001 | |
Published online | 09 February 2024 |
Exact internal controllability and exact internal synchronization for a kind of first order hyperbolic system
1
School of Mathematical Sciences, Shanghai Key Laboratory for Contemporary Applied Mathematics, Nonlinear Mathematical Modeling and Methods Laboratory, Fudan University, 200433 Shanghai, PR China
2
School of Mathematics, Southeast University, 211189 Nanjing, PR China
3
School of Mathematical Sciences & Shanghai Key Laboratory for Contemporary Applied Mathematics, Fudan University, PR China
* Corresponding author: dqli@fudan.edu.cn
Received:
1
January
2023
Accepted:
27
December
2023
In this paper we investigate the exact controllability and exact synchronization in L2 space for a 1-D first order linear hyperbolic system with internal controls located on some part of the domain. Based on the exact boundary controllability theory, we first use the constructive method to establish the exact controllability by internal controls for a time reversible system with inhomogeneous boundary conditions. The method is then adapted to prove the exact internal null controllability for a general system with homogeneous boundary conditions. These results can be then used to establish the exact internal synchronization for the system, and related subjects are further studied.
Mathematics Subject Classification: 93B05 / 93C20 / 35L40 / 37N35
Key words: Exact internal controllability / exact internal synchronization / first order linear hyperbolic system
© The authors. Published by EDP Sciences, SMAI 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.